top of page

Have a look at some of our case studies.

Maidstone School

The Harlequin Group was asked by a local school to help with the building of a brand new sports hall facility on their current grounds. We were requested to provide detailed excavation drawings as the footings were to be built at a deeper than normal level and part of the existing building needed to be protected. Shoring was needed along a 40-meter siding so as not to disturb the existing catering block. The Harlequin Group working with the sports hall installation team and successfully set the groundwork for the new facility to be built upon. At the time of the build, the HSE determined that a 1.2-meter rule be applied, meaning that all trenches over 1.2 meters needed to be shored for safety reasons. Although that is now not the case, Harlequin was more than happy to go the extra mile, or meter in this case, to comply and guarantee the future stability of the project. Working with a school created logistical and safety challenges over and above any of our normal projects. The Harlequin Group is proud to say that those challenges were met and conquered and are now in a position to work with any educational establishments in the future.

Screenshot 2021-10-07 at 9.21_edited.png
shutterstock_1502202212_edited.jpg

01622 226505

©2024 by Harlequin Contractors

bottom of page